Tosçelik Spiral Boru Üretim Sanayi A.Ş.

◌ www.toscelik.com.tr

The foundations were laid in April 2008 at the Tosyalı Holding Osmaniye Facilities, the spiral welded steel piping investment with an annual capacity of 400,000 tons. The facility was completed in about a year over an area of 350,000 square meters and started production in April 2009. Our facility has a very expansive production range at Ø 16"- 120" up to a wall thickness of 28 mm. All internal and external protective coatings can be applied at the facilities with new production technology in API standards and within all norms, and production can be done in Turkish and international standards.

Tosçelik is proud to be the main piping producer for TANAP, the Trans Anatolian Natural Gas Pipeline, the project of the century by supplying a full 470-km section of the project after successfully supplying for Algeria a 500-km and for Tunisia a 400-km natural gas pipeline project. It supplied a total of 200,000 tons of piping for State Water Affairs projects that will bring drinking water to the cities of Gaziantep, Trabzon, and Elazığ. 

As a global piping producer, it is now supplying piping for the BRUA Natural Gas Pipeline, which will connect Bulgaria, Romania, Hungary, and Austria to one another.

In the scope of the BRUA project, natural gas piping at a diameter of 32” and a length of 478 km and connection equipment will be delivered to 14 stock fields along the pipeline. The length of the pipeline will be 480 km and its carrying capacity will be 4.4 bcm.